MARLEY HOUSE

In Residential by kelly

MARLEY HOUSE
Client: Charter Keck Cramer | Contract: $2.5M | Duration: 12 months | Architect: Greenway Hirst Page Pty Limited | Procurement: Fixed Lump Sum
"
From the outset, we were impressed with the expertise and cooperative, solutions-based culture instigated by the Tandem team. An extremely proactive and knowledgeable approach to the project and a keen sense of key project drivers resulted in a tailored but very effective list of proposed changes developed by Tandem, which were incorporated into the project adding positively to the project’s cost, programme and quality outcomes
–Edmund D’Cruz National Executive Director Charter Keck Cramer
Tandem Building Group was engaged to assist Marley House Pty Ltd, with the delivery of a new ground and two upper floor commercial spaces, within the heritage and tree lined precinct of Albert Park. Taking on board the restricted site access, overhead cables and a tight timing schedule, Tandem initiated and implemented a construction programme to provide the best outcome for the site and the client. Technology also played a role in conjunction with a dilapidation survey. Tandem used 3D imaging technology to produce a heat map survey of the undulating, neighbouring walls. This unique site needed a collaborative and solutions based methodology, the project represents precision planning from the Tandem team.